proposed Management plan

Development of Infrastructure, Habitat consolidation and protection

  • Construction of a semi permanent structure between the first and second gate in the PA for nature education programme.
  • Construction of a ticketing counter, class including electricity and water supply.
  • Landscaping and planting on either side of road between the bridge on the Salim Ali road and PA entrance gate with indigenenous tree species.
  • Renovation of the existing guard station in the PA
  • Consolidation of boundary with permanent cairns

Habitat improvement programme 

  • Augmenting the natural growth of mangroves.
  • Cleaning and maintenance of the existing pond with in PA.
  • Augmenting with tree species on the terrestrial ecosystem in the surrounding area of the mangrove in the PA.
  • Eradication of exotic weds.

Development of database, research and monitoring

  • Conducting bird survey annually.
  • Conducting soil and water quality analysis
  • Conducting study on flora and fauna.
  • Year round monitoring  and documentation of avian fauna and other vertebrates in and around the PA.
  • Developing a database of biodiversity in the PA
  • Regular monitoring of vegetation change, birds and animal population, nesting of birds, siltation in the pond.
  • Publicity education and awareness programme
  • Conducting one-day natural study camps.
  • Purchase of binoculars, telescopes, spotting scopes, laptop, LCD projector etc.
  • Construction of two watch points
  • Formation of natural trail / broad walkway between the two watch point.
  • Erecting hoardings, sign boards, palm lets, broachers etc.